HYDRAULIC QUICK MOLD CHANGE

Hydraulic Quick Mold Change Systems for Injection Molding, Stamping and Die Casting

KINGHOU hydraulic mold clamps cut mold changeover time from 90 minutes to under 10 minutes — engineered for injection molding presses 250T to 4,000T, mechanical and hydraulic stamping presses, and cold and hot chamber die casting machines.

SOLUTIONS BY MACHINE TYPE
Quick mold change system for injection molding machine

Injection Molding 01

Best for: Plastic injection molders with frequent mold changeovers
Key benefit: Cut mold change time from 60–90 min to under 5 min
Fits: 50T – 4000T injection molding machines

Quick die change system for stamping press

Stamping Press 02

Best for: Sheet-metal stampers running multiple die jobs per shift
Key benefit: Reduce die changeover downtime by up to 90%
Fits: Mechanical & hydraulic presses, 100T – 2000T

Quick mold change system for die casting machine

Die Casting 03

Best for: Aluminum, zinc and magnesium die-casting cells
Key benefit: Safe swap of molds up to 30T with fewer operators
Fits: Cold & hot chamber die-casting machines

30+

Years of Experience

About KingHou

30+ Years Engineering
Quick Mold Change Systems

KingHou designs, manufactures and installs quick mold change systems for injection molding, stamping, and die casting plants worldwide. Our engineers handle standardization, automation and changeover optimization — turning hours of downtime into minutes of productive output.

  • Quick Die Change System
  • Quick Mold Change System
  • Magnetic Rapid Mold Change System
  • Mold Changing Trolley System
philips logo
buhelp logo
panasonic logo
stant logo
sofima logo
konka logo
changhong logo
thermos logo
supor logo
tcl logo
Technical Insights

Engineering Insights
from Our Team

Hydraulic Mold Clamp Selection: 7 Essential Checks for Plate Thickness

Hydraulic mold clamp selection should match mold plate thickness, T-slot layout, clamp stroke, holding force, safety.

Continue Reading

Quick Mold Change Safety Checklist: 9 Essential Checks Before First Shot

A quick mold change safety checklist helps technicians confirm mold seating, hydraulic clamps, utilities, sensors, ejectors,.

Continue Reading
Please enable JavaScript in your browser to complete this form.

QR Code